Stamped Energy

Platform

Stamped Intelligence on your plant stack

Most plants already have meters and SCADA. The gap is analysis, root cause, and assigned fixes. Stamped delivers real-time intelligence on plant signals, detects waste and equipment issues, and guides operations on what to resolve, verified with evidence, then improved based on decisions taken.

demo.stamped.work
Open ↗

Live interactive demo - click to explore the dashboard above.

The operating loop

Six steps. Same loop every month.

How does Stamped Energy connect to my existing plant systems?

How are prescriptions delivered to the plant floor team?

How are energy savings verified with evidence?

Unified ingestion

SCADA
PLC / CNC
Meters
Utility bill

Stamped

Unified graph

01

Connect

Start with meter + bill

Incomer firstModbus · OPC-UA · MQTT

Production-normalized baseline

Anomaly: demand spike at shift start, 18% above baseline

02

Observe

Baselines that know your shifts

SEC by batch & shiftTariff-aware MD detection

Prescription generated

What

Stagger compressor and press startup

Why

Simultaneous start caused MD spike

Impact

₹2.5-4L / month

Priority: High · Effort: Low

03

Decide

Prescriptions in rupees

What · why · who · ₹Ranked by monthly impact

Action delivery & tracking

WhatsApp alert

Shift B · 06:42

New prescription assigned

Stagger Compressor 1 & Press Line 3 startup

Why: Simultaneous start caused MD spike at shift handover.

Impact: ₹2.5-4L / month potential savings

Owner: Plant Supervisor · Due: Today, 14:00

Tap to acknowledge →

Workflow status

Open
In Progress
Completed

04

Execute

WhatsApp to the floor

Supervisor notificationOpen → done tracking

Potential vs. realized

Potential / month

₹4L

Realized / month

₹3.4L

Running ledger: ₹14L verified since deployment

05

Verify

Evidence before the next cycle

Potential vs realised ₹Ops-cleared ledger

Followed vs ignored

Followed

Rx cleared

Strengthen pattern

Ignored

Reason coded

Retune or deprioritise

Improve

Calibrate thresholds and preferences, not “AI learning about you”

Next month's ranks refresh from cleared outcomes, human-gated

06

Improve

Improve based on decisions taken

Rank and threshold refreshPlant preferences, human-gated

Core capabilities

Signals → verified outcomes

Four platform layers - from universal ingestion through closed-loop governance - sized for SME manufacturers.

StampedEnergy

SCADA / DCS

PLCs & CNCs

Energy meters

BMS / utilities

ERP / MES

Utility bills

Universal ingestion

Captures signals from meters, SCADA, PLCs, and utility bills into a continuous, real-time pipeline - without hardware retrofits or changes to your control systems.

Energy graph

kWh streams

Production

Cost / ₹

Shifts

Time-aligned

Unified energy graph

Organises disparate streams into a time-aligned graph that connects consumption, production, and cost for accurate analytics across your plant.

Prescription

Stagger Compressor 1 & Press Line 3 startup

Root cause · High effort · Shift B

Est. ₹3.5L / month

Contextual intelligence

Domain-specific models detect anomalies, quantify impact in rupees, and generate prescriptions your plant team can act on - not another passive dashboard.

AssignOwner set
WhatsAppTo supervisor
TrackOpen → Done
VerifyM&V check

Verified savings

Potential → realized

Closed-loop governance

Assigns actions, tracks execution via WhatsApp and dashboard, and verifies potential vs. realized savings so every opportunity converts into measurable value.

Deployment path

First prescriptions in two weeks, not two quarters

  1. 1

    Week 1-2

    Meter + bill live

    Baselines and first MD / tariff prescriptions.

  2. 2

    Week 3-4

    First assigned actions

    Supervisor tasks on WhatsApp. Execution tracked.

  3. 3

    Month 2

    Deepen integration

    SCADA / PLC where available. SEC by process.

  4. 4

    Month 3+

    Verified ₹ ledger

    M&V complete. Numbers for plant head and CFO.

Next step

Walk through your meter setup and last three bills

We estimate addressable waste and outline a pilot, only if the numbers justify it.